  1. Please check whether the machine is damaged during installation and choose a suitable place for easy installation and future maintenance.
  2. The place where the equipment is installed must be the floor, the installation pad or the foundation, its levelness is within 6.4mm, and it can bear the operating weight of the equipment.
  3. The chiller should be placed in a machine room with a room temperature of 4.4 ~ 43.3°C, and there should be enough space around and above the equipment for daily maintenance.
  4. At one end of the equipment, there should be a pumping space for cleaning the condenser tube bundle, and a door opening or other openings with suitable positions can also be used.
  5. Select the water pipe with the appropriate diameter, the cooling system and the cold water system when the equipment is running at maximum power, and connect them correctly.
  6. For common applications, the water flow velocity through the evaporator and condenser is allowed to be between 1.0-3.6m/s.
  7. The water flow should remain stable under any load conditions.
  8. The design and installation of all chilled water and cooling water pipes should be carried out in accordance with conventional methods. The chilled water pump should be located on the water inlet pipe of the equipment to ensure the positive pressure and flow in the chiller.
  9. The pipeline should have a firm support independent of the chiller to avoid stress on the components of the chiller. The setting of the hanger should facilitate the alignment of the pipe.
  10. In order to reduce noise and vibration, it is better to install a vibration isolator on the pipeline.
  11. In order to use the chiller economically and effectively, it is recommended to invite water treatment experts to analyze the water supply quality of the evaporator and condenser. Poor water quality will cause fouling to affect heat transfer, or produce corrosion, precipitation, and growth.
  12. Generally speaking, correct water treatment and regular cleaning of the tube bundle can maintain its good performance. If the existing water quality conditions cannot be improved by appropriate methods, then it is necessary to consider allowing the tube bundle.
  13. Please install a filter at the inlet of the water pipe and clean it regularly.
  14. After the leak test is completed, all nozzles must be treated with rust prevention.
  15. In order to facilitate daily maintenance work, users can adopt some (or all) of the following measures:

a) Pressure gauges and stop valves with cocks can be installed on the inlet and outlet pipes of cooling water and chilled water, as close as possible to the chiller;

b) Hanging rails and beams can be erected above the equipment to facilitate maintenance.

Latest News

  • liquid cooled chiller

    3

    Liquid-Cooled Chillers: High-Performance Cooling for Industrial Applications Introduction Liquid-cooled chillers are increasingly becoming the cooling solution of choice in various industries due to their superior heat transfer capabilities…

  • glycol water cooling system

    4

    Glycol Water Cooling Systems: Design, Efficiency, and Maintenance Introduction Glycol water cooling systems are widely used in various industries for their ability to cool equipment effectively while operating in a wide range of ambient tem…

  • cold water cooling system

    4

    Cold Water Cooling Systems: Design and Efficiency Introduction Cold water cooling systems are vital in industries such as manufacturing, pharmaceuticals, and data centers, where they help regulate temperatures for processes and equipment. T…

  • air cooled fluid cooler

    4

    Air-Cooled Fluid Coolers: Design, Operation, and Efficiency Introduction Air-cooled fluid coolers are essential in various industrial processes for their ability to maintain fluid temperatures. They operate by transferring heat from the flu…

loading…

已经是到最后一篇内容了!