New Energy Vehicle Motor Test System Chillers

Before installing the chiller of the new energy vehicle motor test system, the environment and equipment unit inspection should be done to avoid a series of problems in subsequent installation, debugging, and putting into use due to insufficient preparations before installation.
First, the preparatory work before the installation of the battery pack test system chiller

  1. Clean up the installation site of the battery pack test water cooling system.
  2. When the unit is installed in place, ensure the levelness of the unit.
  3. Prepare the external conditions for the installation of the unit (water, electricity, installation holes, pipeline fixing frame).
  4. The installation of the unit should ensure the width of the surrounding space to ensure the normal external heat dissipation of the unit. If it is installed indoors, please install an exhaust fan larger than the heat dissipation capacity of the unit to ensure the heat dissipation of the unit.

Second, the conditions when the unit is installed

  1. The unit is equipped with a three-phase five-wire system with a power supply of 380V.
  2. The cooling water connection of the unit is the rated pipe diameter of the unit during standard water circulation. Due to the limitations of the use conditions, the main cooling pipe can be configured on the condition that the water flow of the unit is satisfied, the resistance of the pipeline can be carefully calculated, and the cooling water pump system can be configured reasonably.
  3. The chilled water connection of the unit is the rated pipe diameter of the unit during standard water circulation. Due to the limitation of use conditions on site, the main pipeline of the refrigeration pipe can be configured under the condition of meeting the water flow of the unit, but the resistance of the pipeline should be carefully calculated, and the cooling water pump system should be configured reasonably.
  4. The unit is equipped with a water tank pump when the unit leaves the factory. When connecting the pipeline on site, if the site conditions cannot connect to the standard interface of the unit, connect a bypass valve to the inlet and outlet of the unit to meet the water flow of the unit during normal operation. Require.
  5. The bypass valve is recommended to be consistent with the inlet and outlet diameters of the unit. If the on-site reduction ratio is not large, the bypass valve can be appropriately reduced but can meet the water cycle of the unit.
  6. When the equipment is equipped with an automatic water switching valve, the opening of the bypass valve of the unit can meet the requirements of the small water flow when the unit is running when the automatic switching valve of the equipment is fully closed.

The battery pack test water cooling system is an important equipment in industrial production. Once its installation is fixed, it will rarely be misappropriated later, so pay attention to the installation of the pipeline before installation, especially for the cooling pipeline connected to the outdoor cooling tower, its installation position and level Degrees should be designed in advance.

Latest News

  • water chiller efficiency

    129

    Introduction to Water Chiller Efficiency​ Water chillers are vital refrigeration systems that cool water (or water-glycol mixtures) for air conditioning, industrial processes (e.g., manufacturing, data center cooling), and equipment temperatur…

  • chiller rate

    146

    Introduction to Chiller Rate​ Chiller rate is a collective term describing the performance metrics that quantify a chiller’s ability to remove heat (cooling capacity) and its efficiency in doing so. Chillers are refrigeration systems that cool…

  • closed cycle cryocooler

    200

    Introduction to Closed Cycle Cryocoolers​ Closed cycle cryocoolers (CCCs) are specialized thermal management systems engineered to generate and sustain temperatures far below ambient, typically ranging from 0.1 K to 120 K (-273.05 °C to -153.1…

  • water cooled chiller types

    205

    Working Principle​Reciprocating water cooled chillers use reciprocating compressors. These compressors operate through the back – and – forth motion of a piston within a cylinder. The refrigerant is drawn into the cylinder during the intake strok…

loading…

已经是到最后一篇内容了!